IRVINE DRILLING UPDATE – THE ISTHMUS

September 7th, 2010

September 6th, 2010, Melbourne: Pluton Resources Limited (“Pluton”) (ASX:PLV) is pleased to announce that core retrieved from diamond hole drilling at the Isthmus region on Irvine Island contains what visually appears to be high grade ore that may be suitable for direct shipping.


IRVINE DRILLING UPDATE – THE ISTHMUS

Research note on Re initiation of Coverage

August 23rd, 2010

pdfRe initiation of Coverage

Research note on Pluton Resources by Investec Securities

August 22nd, 2010

This research has been prepared by Investec Bank (Australia) Limited AFSL 234975 of Level 31, Chifley Tower, 2 Chifley Square, Sydney, Australia 2000.

By accessing, browsing or using this research, you warrant to Investec Bank (Australia) Limited and its affiliates that you are a “wholesale client” or an authorised agent of a “wholesale client” and that neither you nor the entity you represent will directly or indirectly disseminate any content from this research to “retail clients”, within the meaning of section 761G of the Corporations Act 2001.


Irvine Island assay drill hole update

August 4th, 2010

pdfSummary
• Angled drill hole 10DDH018 intersects 5m @ 55.4% iron in the Yampi Member.
• Two intersections of 18m @ 23.7% iron and 9m @ 26.9% iron are returned from the overlying Wonganin Sandstone in drill hole 10DDH018.
• Vertical drill hole 10DDH019 intersects 7m @ 50.3% iron in the Yampi Member
• Two intersections of 33m @ 23.3% iron and, 16m @ 24.4% iron are returned from the overlying Wonganin Sandstone in drill hole 10DDH019.

Assay results update from Irvine Island

July 19th, 2010

pdf1-52x52Summary

  • Angled drill hole ID16A intersects 7m @ 52.5% iron in the Yampi Member.
  • Two intersections of 35m @ 25.0% iron and 16m @ 25.5% iron are returned from the overlying Wonganin Sandstone in drill hole ID16A.
  • Vertical drill hole ID16B intersects 12m @ 55.9% iron in the Yampi Member
  • Three intersections of 13m @ 25.5% iron, 9m @ 23.4% iron, 30m @ 23.9% iron (including 8m @ 33.6% iron) are returned from the overlying Wonganin Sandstone.

Cethana Drilling update

June 24th, 2010

pdf1-52x52The first drill hole (CETD3) in the current drilling program at the Cethana tenement (EL29/2006) in North West Tasmania has been completed. The current two-hole diamond drilling program is targeting porphyry-style copper/gold.

The first drill hole was terminated at 373m after intersecting the Campbell’s Reward chargeability anomaly at Cethana. The chargeability anomaly is characterised by disseminated pyrite and chalcopyrite mineralisation from 253.5-278m, with stronger chalcopyrite mineralisation from 265-278m.

The chargeability zone is also a strong alteration feature with peripheral volcanic rocks altered to chlorite and epidote (propylitic alteration) and the mineralised zone containing higher grade biotite alteration suggesting proximity to a mineralised source.

The potential source of the mineralisation found in CETD3 will be targeted at depth some 300m east by drill hole CETD4, which will commence this week.

Irvine Island Assay Results update

June 23rd, 2010

pdf1-52x52Summary

  • Angled drill hole ID6A intersects 21m @ 48.9% iron (including 8m @ 58.5% iron) in the Yampi Member.
  • Three intersections of 21m @ 27.2% iron, 8m @ 30.7% iron and 7m @ 29.7% iron are returned from the overlying Wonganin Sandstone in drill hole ID6A.
  • Angled drill hole ID6C intersects 18m @ 51.0% iron and 7m @ 52.2% iron in the Yampi Member
  • Two intersections of 28m @ 24.0% iron, 12m @ 25.8% iron are returned from the overlying Wonganin Sandstone.

June 2010 Investor Presentation

June 22nd, 2010

pdf1-52x52June 2010 Investor Presentation

The June 2010 Investor Presentation was given to a range of new and existing investors providing an update on current and future activities at Pluton’s flagship iron ore exploration operations at Irvine Island, WA.

Pluton Resources Broadcast

June 4th, 2010

pdf1-52x52PLUTON RESOURCES LIMITED (PLV) provides the opportunity to listen to an audio broadcast with Mr Tony Schoer, Managing Director in a presentation titled “Pluton Delivers Significant Resource Increase at Irvine Island – Tony Shoer, Managing Director

Media Release

June 4th, 2010

pdf1-52x52Pluton Resources announces 450 percent increase in Western Australian iron ore resource estimates.

“This has the potential to be an operation of State and National significance – and an important economic initiative for the Mayala people.”